Commercial ESS PCS Sizing: Power and Capacity Are Different Decisions

Peak shaving buys power; tariff arbitrage buys capacity. Size them separately.

011 · Read the tariff first

Two-part tariffs charge demand (kW) plus energy (kWh). PCS power attacks the demand line; battery capacity attacks the energy spread.

022 · Power decision

How deep must the peak be shaved? That sets PCS rating. Our PCS series (DZ-NE5000-PCS) is a bidirectional unit for peak shaving and demand management.

033 · Capacity decision

How long must the discharge run? That sets battery capacity — and the arbitrage window.

044 · They interact

Mismatched sizing wastes capital on either side. Size from the load curve, not the catalog.

05Next step

Send the load curve and tariff structure — a sizing framework within 24 hours.

Submit inquiry — answered within 24h

Related application: Open application page